{"id":4838,"date":"2020-08-28T21:45:38","date_gmt":"2020-08-28T18:45:38","guid":{"rendered":"https:\/\/zdg.md\/en\/?p=4838"},"modified":"2020-08-29T10:19:58","modified_gmt":"2020-08-29T07:19:58","slug":"ungheni-chisinau-gas-pipeline-has-a-new-investor","status":"publish","type":"post","link":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/","title":{"rendered":"Gas Pipeline Connection to Romania,  Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n\n\n<p><strong>The European Bank for Reconstruction and Development (EBRD) purchases a 25 percent stake in Vestmoldtransgaz, the gas transmission company operating the newly constructed Ungheni-Chi\u0219in\u0103u gas pipeline.<\/strong><\/p>\n\n\n\n<p>The EBRD <a href=\"https:\/\/www.ebrd.com\/news\/2020\/ebrd-invests-in-unghenichisinau-gas-pipeline.html?fbclid=IwAR3MO6HQBroJ-f5ZJKt_8DedhZDinS6SYzf5zZhz0R8Yc3-voBjaqwHqAx0\">announces the<\/a> acquisition of a 25 percent stake in <a href=\"https:\/\/www.vmtg.md\/\">Vestmoldtransgaz<\/a>, the gas company that is operating the newly built Ungheni-Chi\u0219in\u0103u gas pipeline. Therefore, the EBRD has invested \u20ac20 million.<\/p>\n\n\n\n<p>According to the Transgaz director, EBRD supported Vestmoldtransgaz with the environmental and social components of the Ungheni-Chi\u0219in\u0103u project.<\/p>\n\n\n\n<p>Founded in 2014, Vestmoldtransgaz owns and manages a gas pipeline network in western Moldova and provides natural gas transportation services. In 2018 Eurotransgaz took over Vestmoldtansgaz, a subsidiary of Transgaz, the company operating the Romanian natural gas transmission system.<\/p>\n\n\n\n<p>The construction works of the Ungheni-Chi\u0219in\u0103u gas pipeline started on February 18, 2019, and the estimated value of the project is about \u20ac80 million, according to the cost estimates from the project documentation prepared by Transgaz, Romania.<\/p>\n\n\n\n<p>The 120 kilometers Ungheni-Chi\u0219in\u0103u gas pipeline is to ensure the transport of gas in a volume of 1.5 billion cubic meters\/year. After completion of the 165 km Romanian section in 2021, with two compression stations in One\u0219ti and Gher\u0103e\u0219ti, its transport capacity will increase up to 2.2 billion cubic meters\/year.&nbsp;<\/p>\n\n\n\n<p>According to the Ministry of Economy, the pipeline will be able to provide about 75 percent of Moldova\u2019s average consumption (including the breakaway Transnistrian region), or about 60 percent of the average consumption of the country during the cold period of the year.\u00a0<\/p>\n\n\n\n<p><strong><em>Foto: azernews.az<\/em><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The European Bank for Reconstruction and Development (EBRD) purchases a 25 percent stake in Vestmoldtransgaz, the gas transmission company operating the newly constructed Ungheni-Chi\u0219in\u0103u gas pipeline. The EBRD announces the acquisition of a 25 percent stake in Vestmoldtransgaz, the gas company that is operating the newly built Ungheni-Chi\u0219in\u0103u gas pipeline. Therefore, the EBRD has invested&#8230;<\/p>\n","protected":false},"author":9,"featured_media":4840,"comment_status":"open","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[125,284,11,10],"tags":[420],"autor":[124],"class_list":["post-4838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","category-foreign-affairs","category-important","category-news","tag-moldova-ebrd-gaspipeline","autor-press-release"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor - Ziarul de Gard\u0103<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor - Ziarul de Gard\u0103\" \/>\n<meta property=\"og:description\" content=\"The European Bank for Reconstruction and Development (EBRD) purchases a 25 percent stake in Vestmoldtransgaz, the gas transmission company operating the newly constructed Ungheni-Chi\u0219in\u0103u gas pipeline. The EBRD announces the acquisition of a 25 percent stake in Vestmoldtransgaz, the gas company that is operating the newly built Ungheni-Chi\u0219in\u0103u gas pipeline. Therefore, the EBRD has invested...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/\" \/>\n<meta property=\"og:site_name\" content=\"Ziarul de Gard\u0103\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/zdg.md\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-28T18:45:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-08-29T07:19:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1020\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Carmanu\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZiarulDe\" \/>\n<meta name=\"twitter:site\" content=\"@ZiarulDe\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cristina Carmanu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/\"},\"author\":{\"name\":\"Cristina Carmanu\",\"@id\":\"https:\/\/www.zdg.md\/en\/#\/schema\/person\/d623cbc9e196fec78044598c7c770cc9\"},\"headline\":\"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor\",\"datePublished\":\"2020-08-28T18:45:38+00:00\",\"dateModified\":\"2020-08-29T07:19:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/\"},\"wordCount\":262,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.zdg.md\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg\",\"keywords\":[\"#Moldova #EBRD #GasPipeline\"],\"articleSection\":[\"Economy\",\"Foreign Affairs\",\"Important\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/\",\"url\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/\",\"name\":\"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor - Ziarul de Gard\u0103\",\"isPartOf\":{\"@id\":\"https:\/\/www.zdg.md\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg\",\"datePublished\":\"2020-08-28T18:45:38+00:00\",\"dateModified\":\"2020-08-29T07:19:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#primaryimage\",\"url\":\"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg\",\"contentUrl\":\"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg\",\"width\":1920,\"height\":1020,\"caption\":\"Foto: azernews.az\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.zdg.md\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.zdg.md\/en\/#website\",\"url\":\"https:\/\/www.zdg.md\/en\/\",\"name\":\"Ziarul de Gard\u0103\",\"description\":\"The only investigative newspaper in the Republic of Moldova\",\"publisher\":{\"@id\":\"https:\/\/www.zdg.md\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.zdg.md\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.zdg.md\/en\/#organization\",\"name\":\"Ziarul de Gard\u0103\",\"url\":\"https:\/\/www.zdg.md\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.zdg.md\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2025\/01\/logo-footer-1.svg\",\"contentUrl\":\"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2025\/01\/logo-footer-1.svg\",\"width\":124,\"height\":71,\"caption\":\"Ziarul de Gard\u0103\"},\"image\":{\"@id\":\"https:\/\/www.zdg.md\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/zdg.md\",\"https:\/\/x.com\/ZiarulDe\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.zdg.md\/en\/#\/schema\/person\/d623cbc9e196fec78044598c7c770cc9\",\"name\":\"Cristina Carmanu\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.zdg.md\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8d452f3d4bfb8e58e461d22691afcc6e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8d452f3d4bfb8e58e461d22691afcc6e?s=96&d=mm&r=g\",\"caption\":\"Cristina Carmanu\"},\"url\":\"https:\/\/www.zdg.md\/en\/author\/cristina\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor - Ziarul de Gard\u0103","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/","og_locale":"en_US","og_type":"article","og_title":"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor - Ziarul de Gard\u0103","og_description":"The European Bank for Reconstruction and Development (EBRD) purchases a 25 percent stake in Vestmoldtransgaz, the gas transmission company operating the newly constructed Ungheni-Chi\u0219in\u0103u gas pipeline. The EBRD announces the acquisition of a 25 percent stake in Vestmoldtransgaz, the gas company that is operating the newly built Ungheni-Chi\u0219in\u0103u gas pipeline. Therefore, the EBRD has invested...","og_url":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/","og_site_name":"Ziarul de Gard\u0103","article_publisher":"https:\/\/www.facebook.com\/zdg.md","article_published_time":"2020-08-28T18:45:38+00:00","article_modified_time":"2020-08-29T07:19:58+00:00","og_image":[{"width":1920,"height":1020,"url":"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg","type":"image\/jpeg"}],"author":"Cristina Carmanu","twitter_card":"summary_large_image","twitter_creator":"@ZiarulDe","twitter_site":"@ZiarulDe","twitter_misc":{"Written by":"Cristina Carmanu","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#article","isPartOf":{"@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/"},"author":{"name":"Cristina Carmanu","@id":"https:\/\/www.zdg.md\/en\/#\/schema\/person\/d623cbc9e196fec78044598c7c770cc9"},"headline":"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor","datePublished":"2020-08-28T18:45:38+00:00","dateModified":"2020-08-29T07:19:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/"},"wordCount":262,"commentCount":0,"publisher":{"@id":"https:\/\/www.zdg.md\/en\/#organization"},"image":{"@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#primaryimage"},"thumbnailUrl":"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg","keywords":["#Moldova #EBRD #GasPipeline"],"articleSection":["Economy","Foreign Affairs","Important","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/","url":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/","name":"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor - Ziarul de Gard\u0103","isPartOf":{"@id":"https:\/\/www.zdg.md\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#primaryimage"},"image":{"@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#primaryimage"},"thumbnailUrl":"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg","datePublished":"2020-08-28T18:45:38+00:00","dateModified":"2020-08-29T07:19:58+00:00","breadcrumb":{"@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#primaryimage","url":"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg","contentUrl":"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2020\/08\/BERD-1920x1020-c-default.jpg","width":1920,"height":1020,"caption":"Foto: azernews.az"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zdg.md\/en\/ungheni-chisinau-gas-pipeline-has-a-new-investor\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zdg.md\/en\/"},{"@type":"ListItem","position":2,"name":"Gas Pipeline Connection to Romania, Ia\u0219i-Ungheni-Chi\u0219in\u0103u, Has a New Investor"}]},{"@type":"WebSite","@id":"https:\/\/www.zdg.md\/en\/#website","url":"https:\/\/www.zdg.md\/en\/","name":"Ziarul de Gard\u0103","description":"The only investigative newspaper in the Republic of Moldova","publisher":{"@id":"https:\/\/www.zdg.md\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zdg.md\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zdg.md\/en\/#organization","name":"Ziarul de Gard\u0103","url":"https:\/\/www.zdg.md\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zdg.md\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2025\/01\/logo-footer-1.svg","contentUrl":"https:\/\/www.zdg.md\/en\/wp-content\/uploads\/2025\/01\/logo-footer-1.svg","width":124,"height":71,"caption":"Ziarul de Gard\u0103"},"image":{"@id":"https:\/\/www.zdg.md\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/zdg.md","https:\/\/x.com\/ZiarulDe"]},{"@type":"Person","@id":"https:\/\/www.zdg.md\/en\/#\/schema\/person\/d623cbc9e196fec78044598c7c770cc9","name":"Cristina Carmanu","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zdg.md\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8d452f3d4bfb8e58e461d22691afcc6e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8d452f3d4bfb8e58e461d22691afcc6e?s=96&d=mm&r=g","caption":"Cristina Carmanu"},"url":"https:\/\/www.zdg.md\/en\/author\/cristina\/"}]}},"_links":{"self":[{"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/posts\/4838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/comments?post=4838"}],"version-history":[{"count":0,"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/posts\/4838\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/media\/4840"}],"wp:attachment":[{"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/media?parent=4838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/categories?post=4838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/tags?post=4838"},{"taxonomy":"autor","embeddable":true,"href":"https:\/\/www.zdg.md\/en\/wp-json\/wp\/v2\/autor?post=4838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}